Exhibition Stand Design, and construction service, what we do depends on your requirements. We have a thirty year track record, our stands have been used in the Middle East, America, Canada, and Europe.
Explore below for information about our custom designs [not that lightwieght do it yourself exhibition rubbish you can buy] for more information and our technical documents for contractors and organisers.
We have created sites for sewage pumps and all the way up including fashion products for clients.
What we do Contact form location Report abuse Site privacy
Visit our desktop browser site at http://alanwest.com browser detect is used to redirect there or here. If you do not like the result direct your comments to your telecoms handset supplier and there 'consistent' standards .
Alan West Associates. E-mail:
Email Here
Address: 104 Lower Road, Gerrards Cross, Bucks, SL9
8LB. England
Phone: +44 (UK(0)) 1753 882822
General location.
View Larger MapNearby [detailed].
View Larger MapMaps sourced from openstreetmap.org, due to issues with export failing [busy] on the openstreetmap site when this feature was changed these are screen dumps and then cropped. If you know what a mapcode is then try G8N.02Q
We are located near to Heathrow airport / Slough / Uxbridge in the west of London. As soon as you are on the London Orbital (m25/ Junction 16) and exit onto the the m40 then exit on the Uxbridge turnoff. Locate the A413 and head towards Aylesbury - pass the Denham turnoff and stay on the A413 until the first roundabout. Follow the signs to Gerrards Cross and the lower road is first left, slow down as you are now near your destination. Open street map site or Google Map site - follow the instructions - or use your own solution.
By the London Underground, your aim is Uxbridge underground station and hop on bus a 305 use [Saint Marys School] as a stop. By Train: Via the Chiltern Line (London to Birmingham), [Tube users can alternatively use the Central line to and head for West Rusilip and then connect with the Chiltern Line] to get to Gerrards Cross where you can walk from there. On arrival you can find: us by walking turn left at barclays bank onto the packhorse road, past the ethorpe hotel and a girls school it is a brisk twenty minute walk. Open street map site or Google Map site
©Alan West Associates (alanwest.com/),Trademarks acknowledged.
We do not send any type of unsolicited email, or do the usual things spammers like doing. Should you receive/detect such activities that appear to come from us we would like to hear about it here either to a Web Form or Send email to abuse However take all cases seriously, but please include as much detail as you can, Thank you.
For your convience spf records and sender id records (both) have also been setup. These (if your mail server checks spf etc) can verify if it came from here or was forged from elsewhere. We don't like spam as well so regardless we'd like to here about any 'abuse'.
This domain has dmarc records setup and is in beta.
Any non spam communication to us will remain private, it will not be sold, opted in etc, we may email back hopefully with an answer.
Both dkim and domainkeys signatures have been added to outbound email, In 2007 it was just domain keys (or dkim rfc 4871) in use to sign messages. Message signing will look something like this in the header.
DomainKey-Status: good (test mode) DomainKey-Signature: a=rsa-sha1; c=simple; d=alanwest.com;
q=dns; s=mail2; b=femE0MxAcs3Vlaa+gwL
ftih5t6JhMyerTTrRcdw8xZtAZD9tws/ GylQVVhZPBftvZaNT4qlsHHUAEPE0Bp/
IrpM05mGTzMsvpT9fEyzrGpVKZnRvwma7Tv+ rdPHOffdm5IKgt4t1jaLC5alt1
nndGDhCTfIGV8fSb+Cgncn+nI=
Until the key changes. And any email message from this site should have something like this that your email providers email system can automatically validate against to see if we sent the message of not. If your provider does not offer this there should be some of the headers above.
Naturally inbound messages are also checked for dkim signatures too. Mail privacy via pgp can also be offered at this domain, if keys are swapped in advance.
We respect your privacy, we will try and investigate.Current mail server activity Sending 'new' spam using this form is not recommended as the abuse department who gets it does not like it.
form status:
©Alan West Associates (alanwest.com/),Trademarks acknowledged.
Mobile site is tested at a minimal 240x320 resolution. We do have a 'real' site.
Website Cookies policyMost visitors to site will note a google cookie on it being that uses re-capcha (we used this before Google took it over). No checking of this information is stored by us, and until there is a better way of doing this it likely to remain.
Privacy:IP addresses are logged for form submissions for security reasons and submitted to a lookup service for spam-bots. Some libaries are looked up from a central location not controlled by us. If your computer/ or an ip address assigned to you cannot see this sites content then it has been blackholed for abusive reasons.
Advertising/Proxies'Pform' and other isp based services are a concern to us, and if changing the content of this site by third parties becomes a problem then we do have a solution. Clearly if your isp uses some sort a advert insertion service maybe you should find one that does not ?
If you think that you have received UCE (spam) from our address domain please report it to us at the abuse page.
©Alan West Associates (alanwest.com/),Trademarks acknowledged.
If you have never exhibited before, or have questions please read on. There is more to this than meets the eye. A satisfied client wrote to us.
Many Thanks for the excellent show you and the team built, The clients are delighted with the results. and I've been meaning to get a message to you since the show two weeks ago, last week I was out the office overseas I wanted to say how very impressed I was with the stand that you both designed and built, I have never received more positive comments from so many people about a stand design in almost twenty years of exhibiting with various companies. Great job, many thanks and very well done.
Director, Marketing & Sales
Here you can see some pictures of the many exhibition stands, designed and installed which we have bothered to scan in (we have far too many photographs).
In these images you can see decoration, electrical, graphics (branding) All ready for you and the visitors of your trade show to turn up to, and sell - no tools/transport/labour issues. Your team of staff turns up and you should be ready to go. We handle the install, and dismantling so when the show ends, you do too. - no hanging around.
Once you decide to visit a show with your product or range, talk to us, or once you have bought space or self scheme. We handle all the aspects depending on what the exhibtion site allows us to do with the space you have bought, and you get one invoice for the site built at the end of the show.
How you commission us is up to you, should you wish to use a 'middle man **' then that is your choice, it will affect the size of your bill. It is your budget.
Exhibitions work as people visit a 'topic area' if your firm is not known or you have a new product then this can announce your firm and its products / services to the market to both new and established buyers.
Use the contact forms or email to talk with us, or request a brochure in pdf for printing. The lack of people in the pictures is due to the fact that these are taken when the shows are closed to the public.
Request a PDF BrochureFill in the form below an icon means the form needs information, no dot, then you do not have to give any extra information.
Some people think we should have a brochure even though we never do anything the same because the location,time,client requirements change. Anyhow please fill in the form and a pdf brochure will be generated for you right now.
Alternatively pass on our url to somebody.
You will need pdf reader software.
status:
Type: RISK ASSESSMENT
Carried out by: Alan West, Partner, date: June 2013.
expiry/review: THIS ASSESSMENT TO BE REVIEWED ON NEW ADVICE Select area: Factories Site Work or Document review.
Part 1 Risk assessment for factories used by Alan West associates.
On conclusion of this assessment, I am of the opinion that there is no significant risk to any of those employed by Alan West associates (alanwest.com) and its contractors and that all precautions have been taken in order to reduced the risk to the employees and visitors to the premises.
Risk assessment Part 2 by Alan West Associates (alanwest.com) for on site work All risks and hazards which may become apparent on site will be assessed and any control or preventative measures will be put into practice before any work is to be carried out.
Any risk brought on to a work site by outside contractors cannot be controlled by Alanwest.com or its contractors, but our employees will be made aware of any hazards which can be identified
All contracts undertaken by alanwest.com and its contractors will be assessed individually before the work commences on site and all precautions will be taken to ensure that the risks are minimised as far as possible.
This assessment was made without bias and will be reviewed and revised as required every six months.
REDISTRIBUTION & COPYING of this document in any form please contact policies for approval
Standard definitions, etc.
1. Definitions.
2. Only these conditions apply
These are the sole conditions applicable to contracts between the contractor and the customer and they exclude all other conditions at any time in the past or future put forward by or on behalf of the customer and all representations outside these conditions , No variation of these conditions shall be effective unless the variation be agreed in writing and signed by one of the contractors directors or partners. These conditions shall apply notwithstanding that the contract work and/or contract price finally agreed differs from that originally quoted by the contractor. If at the request of the customer his employee or agent the contractor or any of his employees agents or sub-contractors performs any additional work in any way related to associated with or arising from the contract work these conditions shall apply to the additional work as if the formed part of the contract work whether or not the contract price be adjusted in consideration of the additional work.3. Variation & payment of contract price
(a) In the event of
(b) The contractor shall be paid as follows
(c) all terms are strictly nett and in the event of any part of the contract price or other sum payable under these conditions remaining outstanding for more seven days after the due date the contractor shall have the right to
4. Goods used or supplied and work or design done by the contractor
(a) All goods used or supplied by the contractors in connection with the contract work shall be unless otherwise stated in the quotation be on hire to the customer and the customer shall keep such of the goods as are the hire at all times in his possessions or under his control and shall not without the contractors written consent remove the same from the place where they are installed by the contractor.
(b) All expressed or implied warranties and conditions statutory or otherwise as to description quality or fitness of goods used or supplied on hire to the customer or of work or design done or of services performed by the contractor are by these conditions expressly excluded.
(c) unless prior to any loss or destruction of or damage (such damage not to include damage by fair wear and tear) to the goods used or supplied by the contractor in connection to the contract work the customer requires and secures from the contractor confirmation that such goods have never been insured at the customer expense the customer shall whether or not there be any negligence by the contractor his employees agents or subcontractors.
notices: section 5 to 10 of 11 continues in next column. click to see
5. Goods supplied by through or on behalf of the customer
(a) The customer warrants that he is either the owner or agent of the goods supplied by through or on behalf of the customer for use by the contractor in or in connection with the contract work and that such goods are of sound construction and fit and proper for such use.
(b) All such goods and such other property as may be added to or incorporated in the contract work by or under the arrangements of the customer shall be and remain at the sole risk of the owner and the customer shall except as in (c) of this condition hold contractor harmless from and indemnify gainst claims in respect of loss and destruction of or damage to such goods or other property whether or not there be any negligence by the contractor, his employees agents or sub contractors.
(c) The customer shall be entitled to require the contractor to use the best endeavours to insure in the joint names of the contractor and the customer and at the latters expense the goods and other property referred to in (b) Of this condition and in so far as the contractor is able to do so do then affected from the commencement date of the insurance the customer shall be relieved of the obligation referred to in (b) of this condition to hold the contractor harmless and indemnified.
6. Other property belonging to the customer or which the customer is responsible
(a) if the contract work is to be performed in whole or in part in premises or on property belonging to or from which the customer is responsible the customer shall effect all necessary insurances of such premises or property and hold the contractor harmless from and indemnified against loss or destruction of or damage to such premises or property however caused and whether or not there be any negligence by the contractor his employees agents or sub contractors
(b) Notwithstanding (a) of this condition the customer may by notice in writing to the contractor require him to accept responsibility up to 1,000,000.00 for loss destruction or damage to the said premises or property resulting solely from negligence of the contractor his employees agents or sub contractors in this event the contract price shall be increased by the cost to be incurred by the contractor insuring his potential liability under condition 6(b)
(c) if the customer considers the aforementioned limit to be other than fair and reasonable he may require the contractor to quote the additional cost of securing insurance cover in excess of the limit but no higher limit shall become affected unless and until the customer has agreed to meet the said additional costs and the contractor has confirmed the additional cover is effective
7. Delayed or non completion of contract work.
(a) The contractor shall not be liable for delayed or non completion in whole or in part of the contract work nor for any consequences therefore unless the delay or non completion results from a cause withing the contractors sole control for purposes of this condition
(b) any such delay or non-completion whether or not the delay extends beyond the opening date of the exhibition or other relevant event shall not effect the contractors right to receive and remain and retain the full contract price less only such savings in costs as result from the non completion and such other amount as may be considered to be considered fair and reasonable having regard to all the organisations.
8. Insurances required by customer
The customer requires the contractor to insure in accordance with conditions 4(c) 5(c) 6(b) 6(c) or 7(a) hereof.
9. Failure by customer
The customer shall indemnify the contractor his employees agents subcontractors in respect of every loss and/or liability suffered or incurred all or any of them in consequence of any failure by the customer to:
10. Limit for making compliants
Unless any complaints are made to the contractor as soon as is reasonably possible and in any case not later than seven days after the date of the cause for compliant arising and is continued to the contractor in writing withing a further five days the contract work shall be deemed to have been satisfactory performed and the customer shall have no rights to against the contractor in respect of any defects the contract work.
11. Drawings etc to be contractors property
All drawings designs plans models specifications or estimates prepared or submitted by the contractor are and shall remain the contractors property and must not be copied or reproduced by or divulged in whole or part to any person
Any Quotation does not constitute an offer capable of acceptance No contract shall be created unless and until we accept the customers order and any such contract shall be exclusively governed by standard terms and conditions as set out.
Failure to comply with our terms and conditions which requires us to incure legal fees relating to our terms and conditions would be claimable against the client if proven to be negligent in not meeting our terms and conditions of payment, this would include all court fee and charges to be determined at an interest rate calculated at 8% above the bank rate for the period relating to non payment of our fees.
Change of Conditions. We reserve the right to change these terms, (revised 19/5/2006) terms are supplied on the back of any written paper document REDISTRIBUTION & COPYING of this document in any form please contact policies for approval.
©Alan West Associates (alanwest.com/),Trademarks acknowledged.
©Alan West associates (alanwest.com),Trademarks acknowledged.